1

The 2-Minute Rule for solar installation Australia

News Discuss 
The designs also involve a giant battery at the site, to be certain excessive power may be saved for the night, and a 220 kV transmission line that can hook up the job into the North Star sub-station, in the vicinity of where a fresh a hundred MW solar undertaking https://citypointsolar.com.au/solar-batteries/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story